Family-Owned · Fourth-Generation Craftsmen

Read this before you replace anything.

Ten minutes of homework that saves homeowners thousands — from the family that measures for a living.

40% Off Windows & Doors+ 0% financing for 84 months (OAC) · 30-day price match guarantee

Prefer to talk now? Request a callback

Two Brothers, Hands-On Owners20+ Years Each in the TradeFour Generations of Craft

Get Your Free In-Home Estimate

Tell us about your project — Chris or Vinny will reach out to schedule a time that works.

✓ Free estimate✓ No pressure✓ Owners on every job

Your info goes only to the two of us — never sold, never spammed.

Fourth-Generation Craftsmen Two Brothers, Hands-On Owners 30-Day Price Match Guarantee 0% Financing Available (OAC)
The checklist

Six things to settle before any contract

  • Count what actually needs replacing — failed seals and rot are must-dos; sound windows in back bedrooms can often wait. Phasing is normal.
  • Decide retrofit vs full-frame per opening — not per house. Anyone quoting one method for every opening didn’t look hard enough.
  • Compare series, not brands — every brand has good and basic lines; a “Milgard vs X” comparison means nothing until it’s series vs series.
  • Ask what the install includes — stucco patch? paint-ready finish? haul-away? The cheap quote usually left those out.
  • Get everything in writing — series, sizes, scope, timeline, warranty terms. Verbal promises evaporate.
  • Check the license — California contractors must display a CSLB license number; verify it at cslb.ca.gov before signing anything with anyone.

“This checklist costs our industry money and we publish it anyway — because the homeowners who do the homework are the ones who choose craftsmen.”

— Chris & Vinny, Owners
Questions

Common questions

How do I know if my window seals have failed?

Fog or moisture between the panes that you can’t wipe away — that’s a failed seal, and the insulating gas is gone with it.

Is it cheaper to replace everything at once?

Per-window, usually yes — mobilization spreads across more openings. But phasing beats waiting years to do anything. We quote both ways when asked.